GLOBAL PERSPECTIVE · INDEPENDENT THINKING
UNDERSTAND WHAT MOVES THE WORLD.
World & Power · News analysis

IMO’s Next Audit Cycle Raises the Question of What Happens Between Visits

An Abidjan workshop prepares maritime administrations for a revised audit approach, including continuous monitoring and risk-based prioritisation.

BY GABRIEL NICOLAEV – CYGURU · · 5 MIN READ
READING TOOLS
A container ship viewed directly from above as it travels through blue water.
THE READING GUIDE

Inside this article

01An audit begins before the visit ↓02A completed file may describe an unfinished change ↓03Continuous monitoring needs a defined signal ↓

Event / source date: 10 November 2026 — IMO report on the Abidjan workshop held9–13November; second audit cycle scheduled fromJuly2027. · Published 15 NOVEMBER 2026

An audit begins before the visit

The International Maritime Organization reported on 10 November that maritime administrations from 13 French-speaking countries were attending an audit-preparation workshop in Abidjan. The event ran from 9 to 13 November. It addressed preparations for the second IMO Member State Audit Scheme cycle, due to begin in July 2027, under revised procedures that include continuous monitoring and risk-based audit prioritisation.

The report establishes the training programme and its stated purpose. It does not establish that participating administrations have remedied particular deficiencies, nor does attendance itself prove compliance. The interesting institutional question is what evidence survives after an audit team leaves and before another arrives.

An administration should be able to explain whether a documented procedure remains in use, whether a corrective action changed practice and whether later developments reopened an issue previously marked resolved. Those are analytical tests of a monitoring system. They are not a substitute for the requirements of the scheme itself.

A completed file may describe an unfinished change

Consider a hypothetical administration asked to address a gap in how inspection records are reviewed. It writes a procedure, assigns an official and circulates a template. Those steps can be documented promptly. Whether the new review actually detects problems requires a different kind of observation over time.

An audit record should distinguish the existence of the procedure from evidence of its use. Otherwise, an institution could close an action after producing paperwork while the underlying practice remains unchanged. The distinction is not an accusation against the workshop participants; it is a general risk in any system that uses documentary completion as evidence of operational improvement.

A useful corrective-action record might therefore identify the original problem, the change introduced and the later observation that would demonstrate whether it worked. This gives the institution something concrete to test after the immediate administrative task is finished. It also creates a defensible basis for reopening an action when the expected change does not persist.

Continuous monitoring needs a defined signal

Monitoring everything continuously is neither a clear instruction nor a realistic design. An administration must decide what changes deserve attention and how those changes will be recognised. A new organisational structure, a lost capability or a recurring discrepancy could each have different implications for the reliability of earlier evidence.

In the hypothetical inspection system, a departure by the only person trained to perform a specialised review might matter more than a large volume of routine records. A monitoring process should be sensitive to that change without assuming that every staff movement invalidates the entire system. The question is which capability the evidence depended on.

This suggests a compact set of triggers linked to actual responsibilities. Each trigger should specify who assesses it, which prior conclusion may be affected and what additional information is needed. A monitoring dashboard becomes useful when a change leads to an intelligible decision, rather than merely producing another coloured status indicator.

Risk-based attention must explain its denominator

The IMO report says the revised approach includes risk-based audit prioritisation. It does not, in the brief account reviewed here, provide a basis for CYPAPER to rank individual countries. No such ranking should be inferred from their participation in a preparation workshop.

The broader analytical issue is that a risk signal needs context. A system receiving many reports may be observing more problems, reporting more effectively or both. A system receiving few reports may be performing well, collecting little information or using a narrower reporting definition. Counts alone cannot resolve these alternatives.

For any monitoring design, the comparison should identify the activity being observed and the opportunity for an issue to be detected. This is not an argument for ignoring incident records. It is an argument for asking what each record measures before allowing its volume to determine the institution’s entire picture of risk. Better reporting should not automatically make an administration look worse than silence.

Keep the liaison role connected to the work

The workshop includes designated national points of contact linking administrations with the audit process. A single liaison can make communication coherent, but coherence should not depend on one person privately carrying every explanation. The supporting evidence still needs owners inside the functions that produce it.

In a hypothetical arrangement, the liaison could maintain a clear index showing which unit holds a record and who can explain its current status. That is different from taking responsibility for every underlying activity. It preserves a route from an external question to the people able to answer it accurately.

CYPAPER’s earlier article on trade training examined whether learning remains usable when a delegate returns. This audit issue is narrower and different: evidence must remain traceable and current even when the officials communicating it change. The institution should be able to show the continuity of the function rather than simply the continuity of an individual contact.

The interval is where credibility accumulates

A successful preparation workshop can help officials understand the process they will encounter. The stronger claim—that an administration’s practical capacity has improved—requires later evidence. Keeping those claims separate respects the value of training without asking a programme announcement to prove an outcome it has not measured.

The period before July 2027 provides a concrete horizon for preparation. Institutions can examine whether their records distinguish completed tasks from demonstrated changes and whether responsibilities remain clear between formal reviews. The most useful preparation would expose uncertainty while there is time to investigate it.

Audit credibility ultimately depends on the relationship between a documented account and continuing practice. A visit can examine that relationship at a particular moment. Monitoring should help keep it intelligible afterward. The test is whether an institution can explain what has changed since its last assurance, what remains supported by current evidence and what now needs to be checked again.

Gabriel Nicolaev — CyGuru

Sources & further reading

IMO: French-speaking countries prepare for audit cycle ↗

Illustrative vessel photograph near Curaçao by Bent Van Aeken / Unsplash; not a ship involved in the Abidjan workshop.

FOLLOW THE CONNECTION

Another angle on this subject

Continue through related ideas, decisions and consequences.